Figured it out.
1: The BB Key selector used within the task needs to be exposed as a public variable. (Is Editable)
2: Go back to BT and select the specific task.
3: In the BT details panel for the selected task you can now configure the BB key binding to BB variable.
Else, the binding will default to the first variable in the BB.