Spread main connection into two nodes?

I never reach 2nd phase of Sequence node, because I am stuck in first, I need to set the Reset boolean to “zero” earlier than 0.5 seconds after it was set to “one” but I also need the process signal to continue immediately, not to wait for it 0.5 seconds too

edit: so later in the loop while process is at it’s delay node of 0.5 seconds, this 0.49 delay will be completed will be set the reset boolean to zero and the main signal process will AFTER this finish it;s 0.5 seconds delay and be checked if boolean is zero and as it should be - continue process