Hello,
is it possible, from within blueprint or c++ to set a “section range end” for a specific event in Sequencer?
I need, that added event will set its duration based on some passed variable (global, or from given event?)
Best,
hmental
If this is the wrong section of the forum I apologize, I was having trouble figuring out which section to assign the query to