Hello
I have multiple phases in Revit and when I direct link sync with Twinmotion, every material is overriden to only two : One White and another New Existing which is gray
After this issue, i found a possible solution and I created a special Phase filter just for Twinmotion, with New - By category - Existing By category, Demolished - Not displayed, Temp - Not displayed
I have closed every other Revit 3d view, reset the direct link folder, even deleted it, restarted the PC, etc, but I still get only two materials in Twinmotion.
No I just realized that If I create a new element in Revit, it will be synced with the right material but all the other ones stay the same.
What is the way to do it? Thanks!
LATER EDIT
It looks like it takes every previous phase as Existing and applies that override because i created the Twinmotion phase the last one.
Is there a way to correct it/workaround? How to setup Revit for this?