I’m doing a project in Revit that has an existing phase, demo phase and a future phase. When taking it into Twinmotion, I didn’t have a way to control the phases. If there is a way to do this, can you please give me step by step instructions. If Revit doesn’t have this capability, please consider it in the next few releases. It would be good to switch back and fourth between the existing, demo and future. Maybe a switch to turn them on or off because I would like to see existing and future together, etc.
Thanks,
Steve Butler