Hello everyone.
I need help with a current issue im having.
I want to see if its possible to calculate a date based on a start date and an end date, connecting that information with an animation on the Level Sequencer.
Basically, I need to have the current date based on this, and im wondering if its possible to calculate it based on these three factors (Start date, end date and current frame).
I created a basic UI that has an slider with an start point and end point (I was able to manually set these dates) and I want to have the current frame being displayed as a Date instead, but im new to the blueprints so I’m not sure how to approach this problem.