I am working on a Twinmotion project with linked Revit & Rhino models. The Revit model’s internal origin is not at the same elevation as the project base point, meaning that when I import my geometry it is thousands of feet above the starter ground. This causes issues when using the Horizon tool in Ambiance.
For rendering purposes in general the geometry should all be as close to the origin point as possible. I have created a work-around where each Revit view that is imported exists as a new linked revit model that is then moved & re-located to the correct elevation so it can be as close to the internal origin as possible. This is not ideal since now there are multiple instances that need to be maintained and updated.
Is there any way to change how Twinmotion imports geometry (toggle between internal origin vs. project base point?)