Hi,
I want to link the time values from my level sequence to an external excel file like CSV (Comma-separated values - Wikipedia).
I found the way to get value from a CSV file but can’t link it to a blueprint that get my “level_sequence”.
Anyone could explain me how can I edit my level sequencer with blueprints?
Thnaks a lot