During ICVFX virtual production testing, the entire workflow—from the render node (inner frustum) to the render node (canvas + inner frustum) and then to the LED controllers—relies on ST 2110 transmission, with synchronization locked to the Grandmaster via PTP. However, it was observed that multiple LED controllers received out-of-sync ST 2110 video streams.