from 5.0 to 5.4 is a big jump
if you really need the project to be in 5.4 then try smaller jumps first.
5.0 to 5.1 to 5.2 to 5.3 then finally to 5.4
from 5.0 to 5.4 is a big jump
if you really need the project to be in 5.4 then try smaller jumps first.
5.0 to 5.1 to 5.2 to 5.3 then finally to 5.4