Okay cool thanks for the image tip. I’ve never messed with functions in the blueprint editor so I’m not sure where to even begin. Is there anything I’d be able to drag to the execution pin on the Set Node just before the Open Level node? If I drag off any of the previous set nodes then the new level gets opened regardless of the AND node.