# 4d Construction Schedules from Synchro or Revit or Navisworks

**URL:** <https://forums.unrealengine.com/t/4d-construction-schedules-from-synchro-or-revit-or-navisworks/1437990>\
**Category:** Getting Started & Setup\
**Tags:** construction, unreal-engine, Blueprint, question\
**Created:** [November 30, 2023, 2:47pm UTC](https://forums.unrealengine.com/t/4d-construction-schedules-from-synchro-or-revit-or-navisworks/1437990 "2023-11-30T14:47:58Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![nikitavirat](https://d3kjluh73b9h9o.cloudfront.net/original/4X/2/8/5/28502927f1d97ba1051b3b47ccfe17233bf41ef0.png) [@nikitavirat](https://forums.unrealengine.com/u/nikitavirat)\
**Post date:** [November 30, 2023, 2:47pm UTC](https://forums.unrealengine.com/t/4d-construction-schedules-from-synchro-or-revit-or-navisworks/1437990/1 "2023-11-30T14:47:58Z")

</div>

I am importing my revit model from navisworks (with construction scheduling) to Unreal Engine 5. I would like to add a timeline which demonstrates months in a year : Jan to December which will be linked to the construction schedule. It should move as per the construction schedule. I would like to add Cost graph too. [https://youtu.be/oIMML5rsPxg?si=ZI9Z8O6izlt-D6U\_](https://youtu.be/oIMML5rsPxg?si=ZI9Z8O6izlt-D6U_) this video shows the exact output that I desire. Please can someone guide me

---

<div class="post-metadata">

**Author:** ![KEALAN1991](https://d3kjluh73b9h9o.cloudfront.net/original/4X/2/8/5/28502927f1d97ba1051b3b47ccfe17233bf41ef0.png) [@KEALAN1991](https://forums.unrealengine.com/u/KEALAN1991)\
**Post date:** [April 9, 2025, 10:27am UTC](https://forums.unrealengine.com/t/4d-construction-schedules-from-synchro-or-revit-or-navisworks/1437990/2 "2025-04-09T10:27:03Z")

</div>

I don’t think this is possible from navis works. Maybe synchro or bexel manager as they have plugins.

You could also try aspectu 4d.

> **[Aspectu 4D](https://www.aspectu4d.com/)**

---

<div class="post-metadata">

**Author:** ![MXMN\_22](https://d3kjluh73b9h9o.cloudfront.net/original/4X/2/8/5/28502927f1d97ba1051b3b47ccfe17233bf41ef0.png) [@MXMN\_22](https://forums.unrealengine.com/u/MXMN_22)\
**Post date:** [September 20, 2025, 2:46pm UTC](https://forums.unrealengine.com/t/4d-construction-schedules-from-synchro-or-revit-or-navisworks/1437990/3 "2025-09-20T14:46:21Z")

</div>

What plugins for synchro?